Flash Cladding production - Cladding installation

Cladding production

Cladding installation



Production: Jost Hering Filme / www.josthering.de
Post-production and direction: LokO.film Tobias Steidle / www.lokofilm.de

Architectural concrete from Hering - General informations

nach oben

News

Sanitary Solutions by Hering at the WISA – Conference 2010 in Durban, South Africa

Hering was represented for the first time on this platform and, within the scope of a PPP development project, is currently working on a new toilet concept for so-called Community Ablution Blocks (CABs) for South African townships ... [more]

DAS STUE – a five star hotel in Berlin

A total of around 500 prefabricated parts with the floral pattern were mounted, which is the equivalent of a surface area of 750 m² ... [more]

First automatic public toilet for Toronto

Do you remember the report about the “flying toilet facility”? It’s 2 years ago now since we transported the prototype of our toilet facility to Toronto by aeroplane ... [more]

Side-boarding platform for the Großschwabhausen stop station

On behalf of TS Bau GmbH, Jena, the approximately 110 m long construction was assembled with the aid of 15 platform slabs ... [more]

> Further news headlines

Exhibitions and events

Newsletter