Service operation

Hering’s service operation services includes:

Operation

Public toilet facilities installed by Hering or that already exist, e.g. at stations, enjoy full service.

In detail this includes: maintenance, upkeep, emergency service, troubleshooting, object cleaning and provision of necessary staff, e.g. for special events. Consequently, operation is an “allround carefree package” for every client.

Furthermore, we look after city toilet facilities and car park toilet facilities as well as toilet facilities integrated into buildings offering the following services:

Cleaning

This module includes both the regular (e.g. every calendar day) intensive internal and external cleaning with pressure washing equipment as well as special cleaning operations using specific methods such as high-pressure or jet stream processes for removing graffiti, disinfection of toilet facilities and the supply of consumables.

Technical maintenance

HERING Service: Technical maintenance

Hering ensures the operational readiness and the durability of sanitary facilities by means of regular efficient maintenance in accordance with maintenance schedules as well as electrical safety tests according to VDE and EN.

Maintenance, repairs

Service operation repairs

All repairs arising are carried out by trained specialist staff. Thanks to our emergency service and the associated quick reaction, stoppages are minimised. Hering can also assume the complete risk of the operator.

Toilet controlling

The technical service is completed by the toilet controlling service. Using remote data transmission, specific toilet facilities can be remotely monitored. This means that constant checking and evaluation of user data, cleaning data and availability are possible. Not only as a basis for the remaining services, but rather also as an important source of data for the operator of the sanitary facilities.

nach oben

News

Together with Volkswagen Immobilien, Hering helped to build the InformationsLogistikCenter in Braunschweig

In June 2008, Hering received the assignment to provide the concrete façade. A total of 1,200m² was applied, which consisted of 170 prefabricated parts ... [more]

Extension of the modular railway platforms at Baker Street Station in London

On behalf of the London Underground Limited (LUL) / UK (main contractor: Vinci Construction Ltd, UK), Hering was once again active in the British capital ... [more]

Platform roof type "Bodenheim" for Pasing railway station

After a one year planning and production phase, the two roofs measuring 155 x 9.20 m, were preassembled before the gates of Munich, and each roof was then respectively loaded on 27 railway carriages. ... [more]

The first “PWC” car park toilet facility for Austria goes to Styria

In July 2009, we received our first order to build a “PWC” car park toilette facility in Austria ... [more]

> Further news headlines

Exhibitions and events

Newsletter