Track renewal at Hanau port
News published on 13:38:25 25.05.2009

Hering was busy in the port of Hanau from the beginning to the end of March on behalf of the customer Stadtwerke Hanau. The crew renewed 2 sections of 120 m each and completed the removal of 4 points systems, including closure of the resultant gaps. The tracks were manufactured in "Dresdner Oberbau" form. In addition, ground improvement was also performed using a rotary tiller over an area of 1,500 m², with 1,200 m² asphalted.
News
Sanitary Solutions by Hering at the WISA – Conference 2010 in Durban, South Africa
Hering was represented for the first time on this platform and, within the scope of a PPP development project, is currently working on a new toilet concept for so-called Community Ablution Blocks (CABs) for South African townships
... [more]
DAS STUE – a five star hotel in Berlin
A total of around 500 prefabricated parts with the floral pattern were mounted, which is the equivalent of a surface area of 750 m²
... [more]
First automatic public toilet for Toronto
Do you remember the report about the “flying toilet facility”? It’s 2 years ago now since we transported the prototype of our toilet facility to Toronto by aeroplane
... [more]
Side-boarding platform for the Großschwabhausen stop station
On behalf of TS Bau GmbH, Jena, the approximately 110 m long construction was assembled with the aid of 15 platform slabs
... [more]
> Further news headlines