Track and points renewal in Eschweiler and the central railway station of Aachen

News published on 09:10:59 19.08.2009

On behalf of DB Netz AG, Regional Sector West, Duisburg, renewal work was realised in the Eschweiler railway station between the 24th of May and 7th of June 2009. 3 points (W1, 2 and 12) and 180 m of track were reconstructed. Measures in central station Aachen: Points W 75 and W 76 were renewed between the 19th and 23rd of June. The work was realised in the context of the WE Eschweiler consortium.



nach oben

News

Sanitary Solutions by Hering at the WISA – Conference 2010 in Durban, South Africa

Hering was represented for the first time on this platform and, within the scope of a PPP development project, is currently working on a new toilet concept for so-called Community Ablution Blocks (CABs) for South African townships ... [more]

DAS STUE – a five star hotel in Berlin

A total of around 500 prefabricated parts with the floral pattern were mounted, which is the equivalent of a surface area of 750 m² ... [more]

First automatic public toilet for Toronto

Do you remember the report about the “flying toilet facility”? It’s 2 years ago now since we transported the prototype of our toilet facility to Toronto by aeroplane ... [more]

Side-boarding platform for the Großschwabhausen stop station

On behalf of TS Bau GmbH, Jena, the approximately 110 m long construction was assembled with the aid of 15 platform slabs ... [more]

> Further news headlines

Exhibitions and events

Newsletter