News

750 metres of new platform slabs for Bad Cannstatt: HERING delivers modula®flex solution

On behalf of LEONHARD WEISS, HERING Infrastructure Systems has completed two railway platforms in the Stuttgart district of Bad Cannstatt – from detailed planning and logistics to precise on-site installation.

modular system platform in Bad Cannstatt

Together, the two newly constructed platforms reach a total length of 750 metres. The project utilised our proven modula®flex system, which is particularly suitable for the subsequent elevation of existing platforms. Thanks to its flexible design, the nominal height could be precisely adjusted to 75 cm.

Installation was carried out efficiently using a road-rail excavator, enabling a fast, safe and highly accurate assembly process. The slabs were fitted precisely onto the existing platform surfaces, blending seamlessly into the surrounding infrastructure.

The project in Bad Cannstatt once again demonstrates that the modula® system delivers flexibility, strong performance and maximum process reliability – ensuring a smooth and efficient construction workflow.
 

system platform modula in Bad Cannstatt

Icon Social Media Auswahl
Newsletter IconNewsletter