The multi-storey office building was clad with a total of 262 anthracite-coloured curtain wall panels with washed and sanded surfaces over an area of 271 m². The company HERING took over the planning, production, delivery and installation of the curtain wall.
The assembly was completed in June 2020. The HERING Architectural Concrete team would like to thank the clients for the good cooperation.