Bodenheim system roofing for Hahnefurt stop

A completely new stop was installed on the extension to the Düsseldorf-Wuppertal line on behalf of the Bickhardt Bau AG and Hartung Bau GmbH bidding consortium.

Bodenheim light system roof

HERING was commissioned with the building of the roof and the wall to provide protection from the wind as well as the showcases and benches. HERING’s roof is 30 metres long, four metres wide and 3.70 metres high.

Its Bodenheim light system roof was realised in the colours of red (RAL 3020) and light grey (RAL 7035) in accordance with the specifications of the principal, which is the Regionale Bahngesellschaft in Mettmann.


Always be up to date with the HERING newsletter!

Exhibitions / Events

Newsletter IconNewsletter