Construction site for apprentices at Rhein-Sieg-Eisenbahn GmbH in Bonn-Beuel

The apprentices at HERING Bahnbau GmbH were able to commence an exciting project at the beginning of the year. The project included the renewal of a 200-metre-long section of track and the rehabilitation of a switch at Rhein-Sieg-Eisenbahn GmbH.

It allowed the apprentices at the track-construction department to demonstrate their skills in the dismantling and extension of tracks as well as the rehabilitation of switches. The construction-equipment operators helped with the excavation of waste materials, which was loaded on to trucks, and with the installation of piles from the railway carriage using a slewing crane from our fleet of heavy-duty machinery.


Always be up to date with the HERING newsletter!

Exhibitions / Events

Newsletter IconNewsletter