HERING Group
News

Installation in a Dream Setting: WC Facility by the Baltic Sea

A spectacular installation right on the Baltic coast! In the maritime setting of the seafront promenade in Rostock, HERING Sanikonzept GmbH successfully installed a modern three-room sanitary facility – under truly special conditions.

The highlight: The entire unit was delivered as one fully preassembled piece – an exceptional case, as units of this size are typically delivered in two separate modules and assembled on site. In this instance, however, the entire facility arrived as a single unit – requiring millimetre precision and maximum accuracy.

Seafront promenade Baltic Sea

To ensure a safe and perfectly positioned installation, a tandem lift with two cranes was necessary – a logistical challenge that called for teamwork, expertise, and perfectly coordinated technology.

Thanks to the excellent cooperation of all involved, the installation went off without a hitch and exactly according to plan. In no time, the facility was securely in place – ready to enhance the promenade with a modern and accessible public restroom solution.

Location of the new toilet facility before installation
Toilet facility on tandem lift
Toilet facility installed

Icon Social Media Auswahl
Newsletter IconNewsletter