The existing facade had to be secured with nets; renovation was desperately overdue. The Hering Architectural Concrete team provided and installed in total about 600 m² of white architectural concrete facade with acid treated surfaces. The elements were fixed by way of brackets on the shell construction, which had to be installed before the new windows could be fitted.
In the end, the work was completed on time and the businesses were able to re-open.