The team took advantage of the nightly closures that took place from 1 to 6 December 2020 to install modula® flex panels and raise Platform 1, which is a side-boarding platform.
The innovative platform elements from Holzhausen were installed at the end of the platform over a length of 40 metres and a width of 1.20 metres to enable passengers to board and disembark trains safely and without having to negotiate any steps.
The work was carried out by employees from the Zürcher company. And we have nothing but praise to offer in this regard: the work was carried out at the speed of light by Zürcher’s team and was super-precise.