A five-room WC facility was installed at the Brunnenallee parking lot in March as part of a renovation project being realised by the municipality of Bad Wildungen.
The facility consists of three WC cubicles, a cubicle with three urinals and a barrier-free WC for the disabled. It was possible to quickly install the facility without any problems in spite of the logistical challenges posed by the fact that it consisted of three parts.
What’s special about the facility?
The glass façade with a printed rear that presents the sights of Bad Wildungen. This artistic touch gives the public facility a flair of individuality and promotes local identity.
The WC facility is expected to be taken into operation in the summer as soon as the rehabilitation work on the parking lot has been completed. The WC represents the project’s first milestone.