On behalf of Schleis GmbH and DB Station&Service AG, Regional Area Central in Frankfurt, a 120 m long side platform was erected at the Altenbamberg stop (Bad Kreuznach district).
The challenge in this project lay in the shape of the platform: trapezoidal platform elements were manufactured in the HERING prefabrication plant because of its curved position.
During 4 and 5 October, the HERING team assembled the platform elements, which were delivered by truck and installed by rail crane.