News

Turning Vision into Energy: ASCA Installs First BOOSTER Photovoltaic Façade

A significant step forward for the BOOSTER Project: the first OPV demonstrator has been successfully installed on the façade of a multi-storey car park at FAU Erlangen-Nuremberg.

[Translate to English:] OPV-Fassade von ASCA in in Erlangen

Photovoltaic Facade in Erlangen

The installation features a 35 m² organic photovoltaic (OPV) façade, specifically developed for real-world performance monitoring. The aim is to transform existing buildings into energy-generating structures.
 

Key facts at a glance:
 

  • Module design & façade integration precisely tailored to the building’s structure
  • Overall design, technical system development, and both electrical & mechanical implementation by ASCA
  • Module manufacturing by ASCA using a green donor polymer from Raynergy Tek Incorporation
  • Installation & monitoring by FAU Erlangen-Nuremberg – performance data will be collected for at least one year
     

With this installation, the project takes a major step closer to its goal of combining architecture with renewable energy and driving the energy transition in the building sector.

More information about ASCA: https://www.asca.com/

[Translate to English:] Details OPV-Fassade von ASCA in Erlangen

PV Facade in Erlangen


Icon Social Media Auswahl
Newsletter IconNewsletter