News
+49 2736 27-0
gruppe@hering-bau.de
Railway construction and civil engineering: News from HERING
Select category
Public Toilet Facilities
Architectural concrete façades | HAC
System platforms
System roofs | Platform roofs
Noise protection
Environmental and social issues
Company News | Press Releases
Research and development
protect & clean®
MY CLOUD Transit Hotel
Official Approval for the Foundation Construction Train in Switzerland
New Crane Strengthens the HERING Heavy Machinery Fleet
ESTW Obere Lahn: HERING Ingenieurbau Takes on First Subcontractor Role
VGF Frankfurt: HERING Civil Engineering Hasn’t Lost Its Touch Even After a One-Year Break
Frankfurt Airport Long-Distance Station: Switch Modernization Complete!
Montabaur: Track Renewal on the Moschheim–Bannberscheid Line
Successful Heavy Crane Operations in Siegen Ost and Ferdinandshof
Completion of Construction Work at Meerbusch-Osterath Transport Station
Redesign of the Pedestrian Underpass at the Hanau Transport Station Progresses
Construction Update Betzdorf – September 2024: Progress on the Platform and Staircase
We’ll be seeing you at the InnoTrans 2024
First Milestone: Successful Start of the DB Framework Contract in Borlinghausen
Frankfurt Long-Distance Station: Track Construction with a Touch of Wanderlust
modula®-platforms and Idefix crane revolutionize Densborn station
IDEFIX slewing railway crane in Graben Neudorf – Saalbach overpass
‘Up close’ with the track-foundation-laying train
Absolutely delighted: HERING Group also awarded an innovation prize for its track-foundation-laying train
Successful track refurbishment at Buderus in Wetzlar by HERING Gleisbau
Successful foundation ground rehabilitation in Würzburg by HERING Gleisbau
Roll it! Track-foundation-laying train at the major Stuttgart 21 construction site
Sustainable innovations for railway infrastructure
Première: Track-foundation-laying train ramming with hydraulic hammer!
What does HERING Bahnbau do in winter?
Teamwork in Hösbach – IDEFIX delights
Full steam ahead for both man and machine: Railway construction in Frankfurt Süd-Louisa
Signal Bracket 6029 in Hamburg: Foundation in just 40 hours
Second phase of construction: Preparatory measures for the Frankfurt-Niederrad junction
HERING Bahnbau rocks the rails at Wiesbaden’s main station
‘Idefix’ KRC 1200-2 masters major project: bridge rehabilitation for Infrabel in Gendron-Celles, Belgium
Classic railway construction in Andernach
All-rounder for track construction: HERING track-foundation-laying train commences first project
Major rail-construction project for HERING Bahnbau: Conversion of the stadium junction in Frankfurt-Niederrad
Travelling underground in Frankfurt
Barrier-free conversion of the Bad Breisig transport depot
Successful: Initial trials of the Foundation Construction Train | GGZ
IDEFIX: Welcome to the team!
Conclusion: InnoTrans 2022 – industry summit for rail transport and mobility
Complex construction project in Hanau successfully implemented
Remarkable foundation with steel piping: New stop for Melsungen
A well-oiled team: HERING cranes being used in tandem
HERING Bahnbau active: To also make sure that no one is left out in the rain in Melsungen
Hoyerswerdaer Tageblatt: Gleisbau Sabrodt - Millionen-Investition in Unabhängigkeit
Following an accident in Stadtallendorf: Installation of an auxiliary bridge by HERING Bahnbau
Getting big things rolling: HARTMUT joins HERING’s family of locomotives
Würzburg transport depot: Not without rail construction work by HERING
Nothing is impossible: Major railway construction site in Kassel-Wilhelmshöhe
Drain rehabilitation on the company premises
Civil engineering VST achieves precision landing for renewal of Großen Buseck railway station (Hessen)
HERING professionals as guests in Luxembourg
Complex, exciting, fits! HERING builds new railway overpass in Sigmaringen/Laiz
Aachen Rothe Erde infrastructure project: Major contract for HERING Bahnbau
‘Maximus’ rail crane in operation in Sweden
New in HERING Bahnbau’s range: A genuine all-rounder – the ‘Ballast Bee’
Track installation in Ludwigshafen: Four points and 300 metres of track rebuilt
HERING Bahnbau: Track and points reconstruction in Kassel-Wilhelmshöhe (Lot 5)
Night shift: HERING Bahnbau retrofits tactile guide elements
Track bed cleaning machine BETTY
Barrier-free: Ebenhausen traffic station
HERING-Bahnbau masters the major construction site in Cologne: The reconstruction of tracks and switch points using a crane
Railway construction by HERING: Immediate work SOFO Niederlahnstein
HERING Bahnbau: 12 switching points and 1.4 kilometres of track renewed in Fulda
Large plant at the major railway-construction site at Frankfurt-Ost
Four KIROW railway slewing cranes deployed in Rastatt
Construction site for apprentices at Rhein-Sieg-Eisenbahn GmbH in Bonn-Beuel
HERING in Norway
Shunting locomotive Gravita 10 BB "Emma"
Ehningen railway bridge successfully renewed
Track construction work in Mannheim
Tram track renewal in Duisburg
Replacement new building EÜ Schleusenbach
Hering side-boarding platform type modula® for Rhein-Ruhr Express
Carbon reinforced prefabricated panels for Remstal bridges
Working in a nature reserve – track and points renewal in Cologne-Gremberg
Operations commenced at the new Emmerich-Elten stop
Partial elevation of platforms at Stockstadt station
Hamburg Hafencity: modula® platforms for a superlative construction project
Double the power in railway construction – track renewal with rail crane in the Main Koblenz Station
Renewal of the railway overpass Ehningen
"60t steel on the hook" – auxiliary bridge assembly in Diez
Track construction and crane fleet in operation: Point reconstruction at the Würzburg main station
Points and track reconstruction in Frankfurt am Main
Development of a carbon concrete slab for pedestrian bridges
"Just in time" auxiliary bridge installation - Olpe/Olpebach railway viaduct
Crane operation Kirow KRC 910 - Hamburg Elbbrücken urban railway stop
Hering at the InnoTrans innovation trade fair
Overpass at Siegen station now with lift shafts – installed with Hering's slewing railway crane!
3280 metres of track and two points renewed in Gladbeck
Immediate response in snow-covered Bavaria
Hering presents: A New Track Bed Cleaner
Ascension Day commando
Our civil engineering team active in the Bergisches Land region
Peak performance railway construction times
Two at one fell swoop: Track and track switch new construction ICE works Cologne and storage sidings Cologne-Nippes
Ceremonial delivery of the universal tamping machine
Together we are strong – track cranes KRC810 and KRC910 in a double pack!
Everything from a single source: Train station renovation in Hungen/Germany
Points renovations in the Mainz-Bischofsheim Railroad Station
Auxiliary bridge construction in Darmstadt - railway overpass Erzhausen
Hering rail platform for railway overpass in the Leutesdorf train station
Hering Bau GmbH &Co. KG Systems – The precast plant remains “Q1 Supplier” of Deutsche Bahn AG
Track and switch conversion at the Mainz main train station
Railway construction at the Frankfurt main DB station
Track renewal Rheinbahn Düsseldorf, Ludenbergerstraße and Kettwiger Straße
Track and point renewal in Frankfurt Süd
DB Supplier Distinction – Innotrans 2016
Visit us at InnoTrans!
An addition to the crane family
Hering Bahnbau and Ingenieurbau work hand in hand at Frankfurt Main Station
Auf’m Hennekamp in Düsseldorf – Full speed ahead at the week-end!
ICE Plant in Cologne - Hering Bahnbau is Involved
Gargantuan project at year’s end in Düsseldorf
Renewal of points in Wetzlar
Lighthouse project in Köln-Nippes – Hering Bahnbau is involved
Engineering and track construction on the"Lahn- project”
The ”rail-crane fleet” is still growing!
Hering cleaning vehicle will be cleaning the ballast bed in Brussels for another five years
Installation of curved track connections on the Rhine bank section of the Cologne north-south city railway
Track and point work in Heilbronn
New contract in assembly line technique: track and point renewal Kelsterbach
Bridge sleeper replacement in Baal-Lindern
Lahntalbahn
Switch points and track renewal in Herford
Track and points renovation in Münster Hauptbahnhof and Rinkerode Hauptbahnhof
Page 6 of 7.
previous
1
2
3
4
5
6
7
next
Toggle navigation
X
Home
Products and services
›
Public Toilet Facilities: plan, construction, operation
›
Public Toilet Facilities
Towns and communal spaces
›
Public Toilets
Kiosk toilet
Staff wc
Urinal stand
Unisex urinal toilet
Renovation of toilet facilities
Self-contained toilet facilities
Upcycling WC facilities
School toilets
Hygiene and Service Point
Motorway car parks
›
Car park toilet facilities
Refurbishment (car par toilets)
Industry / Trade / Transport
›
Staff wc
Trucker toilet
Customer toilet
Office toilets
Camping wc facilities
E-charging parks
Renovation of toilet facilities
FlexiKit
rail & fresh
Hygiene and Service Point
Gas cylinder storage
Fitting & Design options
›
Barrier-free accessible sanitary facilities
Toilet for everyone
Roofing and Facades
Interior design (wall and floors)
Equipment & Assessoires
Automatic Cleaning Systems
Service and Operations
›
Surface cleaning and protection
About HERING Sanikonzept
›
Sustainable WC facilities
Contact us
Architectural concrete façades | HAC
›
Architectural concrete façades
Sustainable concrete façades
›
Green concrete façade
Resource-saving concrete
SOLAR.con - Exposed concrete façade with photovoltaics
Rehabilitation with concrete façades
Façade systems
›
Textile-reinforced concrete betoShell®
betoShell®CPC40
betoShell®CLASSIC
betoShell®FLEX30
betoShell®FLEX40
betoShellSiut®
betoShell®NEO30
betoShell® - Eco-balance
Steel-reinforced concrete
Sandwich façades
Curtain facades
Surface design / Finishes
›
Types of finishing treatments
Acidified concrete finishes
Blasted concrete finishes
Sanded concrete finishes
Washed concrete finishes
Smooth concrete finishes
Surface protection
Special concrete finishes
Photo concrete
Matrix formwork technology
Relief concrete
BETOGLASS®
Glass concrete
Reference projects HAC | Architectural Concrete
Contact us at HAC
HAC News
Railway construction
›
Railway construction
Track construction
›
Track work
Switches
Lineside civil engineering
Level crossings
Track and switch inspections
Immediate measures
Crane runways
Reference projects railway construction
Transport depots
›
Platform construction
Reference projects transport depots
Structural engineering
›
Railway overpasses and temporary bridges
Bridge construction
Culverts
Reference projects structural engineering
Logistics
›
Work locomotives
Flat-bed railcars
Track-bound heavy machines
›
Track and railway slewing cranes
Open-top carriage, loading station and ballast spreading machine
Rail-road excavators
Tamping machines
Ballast spreading and grading machines
Track-bed cleaning machine
Workshop service
Reference projects for heavy machinery
Foundation Construction Train
›
References Foundation Construction Train
System roofs / Platform roofs
›
System roofs / Platform roofs
Roofing systems for Deutsche Bahn
›
Evolution 2020 – optimised roofing system
Bodenheim – prefabricated roofing system
Zwiesel – variable roofing system
Roofing sytem with photovoltaic modules
Enclosures
Roofing systems for public spaces
›
PALYO® – modern steel / glass roofing
StiKK® – filigree steel / glass roofing
Evolution 2020 – optimised roofing system
Bodenheim – prefabricated roofing system
Zwiesel – variable roofing system
Roofing sytem with photovoltaic modules
Enclosures
Roofing solutions for e-charging parks
References roofing systems
HERING system roofs - Contact
System platforms modula®
›
System platforms modula®
System Platforms with CO₂-Reduced Concrete
Systems for new platform construction
›
System platform modula® - the TT slab
modula® light - the modular platform system
modula® shift - subsequent level change
modula® temporaer - temporary platform
Systems for platform raising and renovation
›
modula® flex - for subsequent elevation
modula® shift - subsequent level change
Systems for temporary use
›
modula® temporaer - temporary platform
Reference projects system platforms modula®
HERING System platforms - Contact
Noise protection
›
Noise protection for urban areas
Transparent noise protection façade Urban Protection Shield®
Reference projects
Our specialists for noise production solutions
MY CLOUD Transit Hotel
About HERING
›
Company history
Environmental and social issues
Management
Head offices
Branches
Certificates
Sustainability
›
Our vision
Sustainability report
Certifications
Data collection environment and energy
Team environment and innovation
News
Contact
Home
English
Deutsch
Newsletter