Noise protection reference project: Noise barrier at the Weilheim a. d. Teck line

HERING’S contribution to the project consisted of the installation of 9 noise barriers along the railway line. The total length of the walls is approx. 1.7km and includes 11 overhead line masts. One of the walls was installed on a dam wall.

Construction panel

Weilburg a. d. Teck
Installation of noise barriers on the new line PFA 2.1c


Client:

DB Netz AG, Stuttgart

Year of construction:

2019 - 2020 

 