HERING’s logistics services
Work locomotive BR360

Work locomotive V60 BR360 by Krupp

Technical Data

Manufacturer Krupp
Engine power 478 kW / 650 hp
Starting tractive effort 117.6 kN
Speed 60 kph
Year of make 1960
Weight 48 tonnes
Miscellaneous EBuLa (electronic timetable)

Our Fleet: Work Train Locomotives of HERING Bahndienste GmbH

2 x GRAVITA 10 BB

HERING’s rail logistics fleet features two powerful BR261 Gravita locomotives from Voith, ideally suited for shunting and heavy-duty construction logistics.
Discover technical details and images here.

1 x BR218

Proven rail power with a new look: The HERING logistics fleet also includes a BR218 locomotive by MaK—trusted technology for flexible railway logistics.
Click here for images and detailed specifications.

1 x V60 BR360

Powerful and reliable: The HERING logistics fleet is equipped with a V60 BR 360 work locomotive from Krupp—ideal for shunting and on-track logistics.
Find images and full technical details here.

[Translate to English:] Arbeitszug V90

1 x V90 BR295

Optimized for shunting: The V90 locomotive is a high-performance and flexible addition to the HERING logistics fleet—perfectly suited for demanding rail logistics tasks.
Click here for images and detailed specifications.

Focus on sustainability

The ongoing optimisation of our fleet and machine equipment also included the installation of soot particulate filters in our locomotives, which has allowed us to reduce the emissions from transport trips. These particulate filters are part of the exhaust after-treatment systems that help improve air quality and reduce the impact that diesel combustion engines have on the environment. We also always aim to use the smallest and most economical machines possible in order to keep emissions and consumption low while minimising any harm to the environment.

When things are tight:

  • Emergency transfers
  • Spontaneous transfer trips
  • Regular transportation of all kinds of construction machinery and freight
  • Fast and reliable implementation

HERING Railway construction: Projects

Track foundation train installing a driven pile
With Vibratory Power to the Driven Pile: Foundation Construction Train Successfully Deployed
New track installation
Renewal of Tracks and Switches: Operation for KSW Kreisbahn Siegen-Wittgenstein
BR 218 locomotive in the Black Forest
Our Locomotive BR 218 “Hartmut” on duty in the Black Forest
Lifting of torsion beam with railway slewing crane
Tandem lift in Essen: KRC 810-3 and KRC 1200-2 (“Idefix”) in operation
Icon Social Media Auswahl
Newsletter IconNewsletter