VGF Frankfurt/Main Reversing loop


In addition to the track construction work on the line Waldfriedhof - Rheinlandstraße (Lots 1+2), Hering also realised the reversing loop project (Lot 3) for VGF in September and October 2017.

Track construction works / Reversing loop

The installation of a reversing loop with a radius of 22 meters is considered a special challenge and a central achievement of this project. In addition, for example, 165 m of grooved track were renewed and over 1,000 tons of frost protection material was installed.

Further details can be found on the construction site sign.

nach oben

This website uses cookies

This website uses cookies to improve our visitors‘ user experience.

Some of these Cookies are technically imperative to be able to allow certain functions of the website (Session Cookies). These Cookies represent a justified interest as per Section 6 Subsection 1 lit. f GDPR.

Furthermore, we use some Cookies that serve the purpose of obtaining information about the behaviour of users and to constantly improve our website on the basis of this information (Tracking Cookies). With the help of the following buttons, you can activate or deactivate these cookies:

Toggle navigation