Structural Engineering
Railway overpass Ahausen

Railway overpass Ahausen

Build the formwork structure in a side position and slide it into its final position. Partially demolish the old wing walls and secure them with grout anchors. Create reinforcements and pour concrete for the frame structure in its final position.

Construction panel:

Railway overpass Ahausen


Client:

DB Netz AG, Münster

Execution period:

06/2023 - 02/2025

Contract Value:

Approx. €0.8 million

Scope of work:

Structure

  • Total Length of Superstructure: 12.42 meters
  • Total Width of Superstructure: 4.95 meters
  • Maximum Clear Height: 3.30 meters
  • Sliding Distance of Formwork: 18.00 meters

Quantities

  • 350 m³ of concrete
  • 45 tons of reinforced concrete steel

Further reference projects:

Structural engineering with HERING:

  • Construction of new railway overpasses as well as partial renewal and rehabilitation
  • Construction of new crossing structures
  • Bridges