Structural engineering
Railway overpass Wittenhusen

Wittenhusen railway overpass

Remove old steel superstructures. Install two temporary bridges, each 24 meters long. Create and anchor track supports. Install bored piles for the support of temporary bridges. Build the structure beneath the temporary bridges. Remove temporary bridges and install two steel superstructures. Carry out road and landscaping works.

Construction panel:

Railway overpass Wittenhusen


Client:

DB Netz AG, Hannover

Execution Period:

09/2022 - 04/2025

Contract value:

Approx. €3.6 million

Scope of Work:

Structure

  • Span: 8.50 meters
  • Total Width per Superstructure: 5.30 meters
  • Minimum Clear Height: 4.30 meters
  • Anchored Supports

Quantities

  • 600 m³ of concrete
  • 100 tons of steel superstructures
  • 120 tons of reinforced concrete steel
  • 600 m² of excavation support

Further reference projects:

Structural engineering with HERING:

  • Construction of new railway overpasses as well as partial renewal and rehabilitation
  • Construction of new crossing structures
  • Bridges