New intersection structure in the Neu-Isenburg area.
rail-civil-engineering@remove-this.hering-bau.de
+49 2736-27-151
RWT / Wayss & Freytag
09/2022 - 03/2026
ca. 8 Mio. €
Conversion at Galluswarte and the north side of the main railway station.
Preparatory measure for the second construction stage at the Niederrad junction in Frankfurt am Main.
One CO2-neutral ICE maintenance works, double crossing switches, 16,500 metres of different types of sleepers, elevated tracks
One conservation area, renewal of more than two kilometres of track, more than 3,000 concrete sleepers, 300 rails
Two lines, three tracks and 11 switches
Renewal of 3,280 metres of track, two switches and deep drainage complications
Thirteen switches, two tracks, complex construction work conditions and technical material-conveying silo equipment
Reconstruction of 750 metres of track, two switches, ballast replacement, track-side paths and one locomotive
Realisation of a turning loop with a 22-metre radius