Track and Switch Renewal on the Moschheim-Bannberscheid line, Route 3747

Vorschaubild YouTube Video

Construction panel

Track and Switch Renewal on the Moschheim-Bannberscheid Line, Route 3747


Client | Principal:

DB Netz AG

Execution Period:

05/2024 - 07/2024

Scope of work:

  • 1.4 km of track renewal
  • Replacement of 10 switches
  • Improvement of the subgrade
  • Partial renewal of the track line
  • Handling of:
    • 9,200 tons of excavation
    • 4,500 tons of subgrade protection layer
    • 6,500 tons of ballast

Special Measures:

  • Modernization of 2 switches in Moschheim (55-hour closure period)
  • Closure of level crossings in Wallmerod during switch replacement
  • Transport of materials and equipment via interim storage and trucks due to limited access on the single-track line

HERING reference projects:

Track construction with HERING

  • One-stop comprehensive solutions
  • Alternative products and construction methods
  • Individual solutions and immediate measures
  • Strong network of partners
  • Modern and powerful machinery
  • Professional project management
  • Pre-qualified, competent and reliable
Newsletter IconNewsletter