DB Netz AG
05/2024 - 07/2024
Track and Switch Renewal on the Moschheim - Bannberscheid line
Track and Switch Renewal on the Erdbach - Montabaur line
Track and points renewal
Track and points removal and new installation
Conversion at Galluswarte and the north side of the main railway station.
Preparatory measure for the second construction stage at the Niederrad junction in Frankfurt am Main.
Dismantling of individual track sections and installation and conversion of auxiliary bridges.
One CO2-neutral ICE maintenance works, double crossing switches, 16,500 metres of different types of sleepers, elevated tracks
One conservation area, renewal of more than two kilometres of track, more than 3,000 concrete sleepers, 300 rails
Two lines, three tracks and 11 switches
Renewal of 3,280 metres of track, two switches and deep drainage complications
Thirteen switches, two tracks, complex construction work conditions and technical material-conveying silo equipment
Reconstruction of 750 metres of track, two switches, ballast replacement, track-side paths and one locomotive
Realisation of a turning loop with a 22-metre radius