The conversion of the Bad Kleinen railway station was completed in December 2018 with all the major measures being concluded to the satisfaction of all parties involved in the construction project. Among other structures, two island platforms were also built while a new pedestrian overpass with lifts was installed to provide barrier-free access to the platforms from the station forecourt. The conversion work was commenced in autumn 2016. Hering built the two identical Bodenheim-light platform roofs as part of the conversion measures.
The modern and barrier-free railway station was taken into operation on time on 9 December 2018.
Photos: Kay-Alexander Schuh
BUG Verkehrsbau AG (general contractor) and DB Station & Service AG, Berlin (principal
2017 und 2018
Workshop planning and structural analysis, production, delivery and assembly of two Bodenheim-light platform roofs
2 x Bodenheim light,
Dimensions (LxW): 51 m x 9.30 m