To accomplish that, a target/actual comparison is made to check the manufacturer's factory based on the rule base of DB AG and the planning released for the execution. This audit took place on 02 August 2017.
After checking through the necessary documents and documentation along with a walkaround inspection through the precast plant, the “Q1 Status” was once again confirmed.