Hering Bau GmbH &Co. KG Systems – The precast plant remains “Q1 Supplier” of Deutsche Bahn AG

The DB AG supplier management provides for a quarterly Q-classification. An external audit performed by representatives of Deutsche Bahn AG is aimed at determining the quality capability of the precast plant when manufacturing railway platform elements.

To accomplish that, a target/actual comparison is made to check the manufacturer's factory based on the rule base of DB AG and the planning released for the execution. This audit took place on 02 August 2017.

After checking through the necessary documents and documentation along with a walkaround inspection through the precast plant, the “Q1 Status” was once again confirmed.