Prefabricated platforms modula® shift

For the subsequent level change of prefabricated platforms

With the modula® shift system, modula® platforms can optionally be changed in height at a later date without having to replace system components. This offers particular advantages if it is already known during the construction of a new platform that a different level will be required in the future than at the time of construction. In this way, the platform can be subsequently raised or lowered with the modula® shift system, cost-effectively and with minimal effort. For this purpose, the modula® shift spacer elements are simply inserted between the webs of the modula® platform and the foundation, adjusted and fastened so that the platform can be used again at the new level as soon as possible.

We are of course on hand to support you in the planning of your system platform projects. To achieve a project-related solution that is both economical and functional, we can provide you with planning aids such as sample plans and Revit component families in our digital planning catalogue. However, please do not hesitate to contact us in person if you have any questions or suggestions.

modula® shift - system advantages:

  • Most cost-effective option for subsequent modification of the access level
  • Time saving in planning
  • Very short overall construction time
  • Minimal obstruction to railway operations during assembly
  • Reduction of project costs through savings in securing and construction monitoring times as well as operating times and construction site logistics
  • Track safety and construction monitoring effort minimised
  • Work is possible during breaks or also during night-time shutdown periods.
  • Minimum possible extent of construction site logistics required
  • Reusability of all components / no disposal costs

HERING system platforms modula®: News

We’ll be seeing you at the InnoTrans 2024
70 metres of modula® platforms for the Saarbahn rail link in Bübingen
Central platform modula® for Denmark
Platform successfully raised in just four weeks!

HERING sustainability

At HERING, we see ourselves as pioneers in the field of sustainability. As early as 1996, we were the first construction company in Germany to obtain EMAS certification. Every three years, we publish an environmental statement documenting our goals and how we have achieved them. Actually, for the first time, we published a sustainability report with an integrated environmental statement in accordance with EMAS - a logical next step in view of our ecological and social responsibility. It documents how we deal internally and externally with the issues that are essential to our future viability.

Newsletter IconNewsletter