The two roofs of the Bodenheim type are central platform roofs and have suspended ceilings. Both constructions are each 25 m long. The elements were delivered by truck and loaded onto rail wagons. The installation was carried out from the track with two-way excavators. In summer 2018 a third roof will be erected at Wabern station.