The Erndtebrück railway station has been extensively and innovatively redesigned by HERING in the last two years.
In addition to numerous civil engineering measures, such as the construction of new central platforms and the renovation of the pedestrian underpass, the modernisation of the superstructure was also tackled with full dedication.
DB Station & Service AG (MOF II)
DB Netz AG (Superstructure)
05/2016 to 05/2018
Approx. 1.9 million € (MOF II)
Approx. 1.2 million € (Superstructure)
MOF II
Reconstruction and new construction of 2 central platforms (140 m each)
Including:
Cable civil engineering, drainage, equipment, lighting,
Grounding and access,
New construction of elevators,
Reconstruction and new construction of staircase with enclosure, renovation of the pedestrian underpass (PU) with partial backfilling,
Corrosion protection of a platform roof
Renewal of 4 points, 6 tracks
Track switch dismantling with gap closure