Civil engineering reference project: Redesign of Erndtebrück railway station

The Erndtebrück railway station has been extensively and innovatively redesigned by Hering. In addition to numerous civil engineering measures, such as the construction of new central platforms and the renovation of the pedestrian underpass, the modernisation of the superstructure was also tackled with full dedication. 

Construction panel

MOF II - Redesign of Erndtebrück station incl. track and points renewal


Client:

DB Station & Service AG (MOF II)
DB Netz AG (Superstructure)

Completion period:

05/2016 to 05/2018

Order volume:

Approx. 1.9 million € (MOF II)
Approx. 1.2 million € (Superstructure)

Scope of services:

MOF II
Reconstruction and new construction of 2 central platforms (140 m each)
Including:
Cable civil engineering, drainage, equipment, lighting,
Grounding and access,
New construction of elevators,
Reconstruction and new construction of staircase with enclosure, renovation of the pedestrian underpass (PU) with partial backfilling,
Corrosion protection of a platform roof

Superstructure

Renewal of 4 points, 6 tracks
Track switch dismantling with gap closure
Renewal of level crossing

HERING reference projects transport depots:

Transport depots with HERING

  • Construction of all kinds of new transport depots and alterations to existing ones (barrier-free, turnkey, complex projects, temporary systems)
  • Cost-effective comprehensive solutions
  • Alternative products and construction methods
  • Turnkey fulfilment of your requirements
  • Experience and know-how for generations
  • Modern and powerful machinery
  • DB pre-qualifications
Newsletter IconNewsletter