Dismantling of the rails and demolition of the old structure, preparation of the sub-grade, realisation of the complete structure, backfilling and realisation of the superstructure as well as the tracks.
DB Netz AG, Cologne
10/2019 to 05/2020
€ 1.8 million
Structure: 4.52 metres high, 6.46 metres wide, 17.65 metres long
Masses: 120,00 cubic metres of concrete, 42.00 tonnes rolled girder, 120.00 metres bored piles, 250.00 square metres of sheet pile shoring, 16.00 m temporary bridge
Extremely confined construction area