Noise protection reference project: Noise barrier at the Weilheim a. d. Teck line
HERING’S contribution to the project consisted of the installation of nine noise barriers along the railway line. The total length of the walls is approx. 1.7km and includes 11 overhead line masts. One of the walls was installed on a dam wall.
Construction panel
Weilburg a. d. Teck Installation of noise barriers on the new line PFA 2.1c