Railway construction in Frankfurt Süd-Louisa

Track and points removal and new installation in shifts over 24 hours.

Construction panel

Railway construction
Frankfurt Süd-Louisa


Client:

Deutsche Bahn AG

Construction period:

07/2023 - 09/2023

Order Volume:

7 Mio. €

Total performance:

4.5 km of track, 13 points, 2.6 km of rail replacement

Machines used:

Logistics from start to finish and around the clock with

  • 3 locomotives
  • 4 road-rail excavators
  • 1 railway slewing crane
  • material-conveying-silo technology
  • tamping machines
  • tracked loader
  • bulldozer
  • tracked excavator

HERING reference projects:

Track construction with HERING

  • One-stop comprehensive solutions
  • Alternative products and construction methods
  • Individual solutions and immediate measures
  • Strong network of partners
  • Modern and powerful machinery
  • Professional project management
  • Pre-qualified, competent and reliable
Newsletter IconNewsletter