Gießen railway station

Hering renewed 13 points and 2 tracks from Summer 2018 through Spring 2019  at the Gießen railway station. The order volume for DB Netz AG was €1.7 million.

Further details can be found on the construction panel.

Construction panel

Railway station Gießen
Track and point renewal


Client:

DB Netz AG

Completion period:

08/2018 to 03/2019

Oder volume:

approx. 1.700.000 €

Scope of work:

Reconstruction: 2 tracks and 13 points
Complete ballast renewal (partially with the use of MFS technology)
Load tamping of various points and tracks

Particularities:

Complex construction work conditions.

HERING reference projects:

Track construction with HERING

  • One-stop comprehensive solutions
  • Alternative products and construction methods
  • Individual solutions and immediate measures
  • Strong network of partners
  • Modern and powerful machinery
  • Professional project management
  • Pre-qualified, competent and reliable
Newsletter IconNewsletter