Hering renewed 13 points and 2 tracks from Summer 2018 through Spring 2019 at the Gießen railway station. The order volume for DB Netz AG was €1.7 million.
Further details can be found on the construction panel.
Construction panel
Railway station Gießen Track and point renewal
Client:
DB Netz AG
Completion period:
08/2018 to 03/2019
Oder volume:
approx. 1.700.000 €
Scope of work:
Reconstruction: 2 tracks and 13 points Complete ballast renewal (partially with the use of MFS technology) Load tamping of various points and tracks