Reference project track construction: Gießen railway station

HERING renewed 13 points and 2 tracks from Summer 2018 through Spring 2019  at the Gießen railway station. The order volume for DB Netz AG was €1.7 million.

Further details can be found on the construction panel.

Construction panel

Railway station Gießen
Track and point renewal


Client:

DB Netz AG

Completion period:

08/2018 to 03/2019

Oder volume:

approx. 1.700.000 €

Scope of work:

Reconstruction: 2 tracks and 13 points
Complete ballast renewal (partially with the use of MFS technology)
Load tamping of various points and tracks

Particularities:

Complex construction work conditions.